Filinvest Axis
Muntinlupa
Overview
Filinvest Axis Tower (One / Two) is a 25-storey building located in the heart of Northgate Cyberzone by Filinvest. Axis Tower One is part of a hub with four timeless modern contemporary towers laid-out on an X-pattern with office spaces in a north-south orientation to maximize natural lighting, and at the same time, minimize heat gain from the east-west solar exposure. The interior is designed with sustainability, modernity, and energy efficiency in mind. Filinvest Axis Tower (One / Two) has 19 office floors, five podium parking levels, and three basement parking levels shared amongst the four Axis Towers.
In the middle of the development is a generous area for rest and relaxation, with landscape features that include a sloping garden and a sculptural fountain that serves as a nexus of the four buildings giving an experiential link that offers a park-like setting for the varied users of Filinvest Axis.
Location
Filinvest Axis is located along Northgate Avenue, Northgate Cyberzone, Filinvest City, Alabang, Muntinlupa City.
Features & Specifications
Leasable Area
- Floor: Bare concrete, depressed by 100mm
- Wall: Plastered finish (one coat of paint finish)
- Ceiling: Exposed concrete soffit with one coat finish, fire sprinkler system, FCU
- Height Clearance: 4.00 meters floor to floor, 2.70 meters floor to ceiling
- Chilled Water AC System by DCS (District Cooling System)
Base Building
- Provided 8 elevators (1,350 kgs each)
- Automated and integrated with the latest security and access buildings systems with digitalized visitor management system integrated with turnstile security system and elevator destination control system
- High density telecommunication provision for four (4) Telco service providers
- N+1 redundancy set-up (Three (3) generators - US brand 1,800 KVA each)
- Maximum of 150 VA/sqm for lighting, outlet and small power requirements
- Density of 5 sqm ± per person of Net Usable Area
- Certified LEED Gold
Delivery
Tower 1: Completed March 2018
Tower 2: Completed June 2019
Tower 3: Completion June 2022
Tower 4: Completed August 2021
All project details are for information purposes only. All details are subject to change without prior notice.